| SERVING: The Mid-Atlantic and Northeastern United
States |
|
COMPLETE BUILD OUT — York, PA
Finding a good site that did not require any zoning requests or
other variances was the key to the fast track of this project. Actual
construction time was about 4 months to complete this 60,000 square
foot facility. This was the second project using Moove In Self Storage’s
new office and color scheme. Constructed were 1 Over/Under climate-controlled
building and 2 single-story drive-up buildings.
|
|

Bulk Site work begins
|

Start of erection on
poured concrete pad
|

Over / Under Building
|

Signature dairy-themed barn office with burgundy roof and matching doors.
Complete Build Out — Leesport, PA
Utilizing a site lying under a power line is generally
considered impossible to build. With the low impact of storage,
13 small buildings were constructed on either side of the right
of way of the power lines. Gated access was provided to the utility
on both ends, in case of emergency or maintenance of the lines.
|

|
Copyright © 2008 Investment Real Estate LLC. All rights